-63%

Testing Commissioning 115 KV GIS Part 2 By Osama Abdel Aziz

$15.00

File size: 2.15 GB
Media Type: Online Course
Delivery Time: 1-12 hours.
Content proofWatch here!

Description

Testing Commissioning 115 KV GIS Part 2 By Osama Abdel Aziz – Instant Download!

Testing Commissioning 115 KV GIS Part 2
Testing Gas Insulated Substation

What you’ll learn

  • Advantages of GIS : Gas Insulated Switchgear (Substation)
  • Challenges of Testing Gas Insulated Substation
  • How to Use Earth Switch in Testing ?
  • Test Contact Resistance of the Circuit Breaker By Conventional Method
  • Test Contact Resistance of the Circuit Breaker By DualGrounding Method
  • Test Contact Resistance of the 115 KV GIS BusBar
  • Timing Test of the Circuit Breaker
  • Timing Test of the Isolator Switch
  • Timing Test of the Earth Switch
  • 10 KV Test For Earth Switch
  • Challenges of Testing Instrument Transformers
  • The Purpose of The Characteristic Test in Current Transformer
  • The Importance of The CT Loop Test
  • The Purpose of The Primary Test in Current Transformer
  • The Purpose of The Characteristic Test in Voltage Transformer
  • The Importance of The VT Loop Test
  • Which is better MRCT or CT Analyzer with Current Transformer Tests ?
  • Functional and Interlocking Test
  • The Purpose of The BusBar Stability and Sensitivity Test
  • The Importance of The High Voltage Test
  • Partial Discharge Sensors
  • how to Test Partial Discharge in Site ?

Requirements
The basic electrical principles

Description
Dear fellows,

This is the most comprehensive online training of gas insulated substation . Here you will learn all thing about GIS.

Gas insulated substations are the most common type of substation that you will find on the electrical network, due to their effectiveness and simplicity.

This course will give you an appreciation of how to Testing,commissioning this type of substation and introduce you to all of the equipment’s that you will find in a typical gas insulated substation.

we will go through the following topics

  • Advantages of GIS : Gas Insulated Switchgear (Substation)
  • Challenges of Testing Gas Insulated Substation
  • How to Use Earth Switch in Testing ?
  • Test Contact Resistance of the Circuit Breaker By Conventional Method
  • Test Contact Resistance of the Circuit Breaker By DualGrounding Method
  • Test Contact Resistance of the 115 KV GIS BusBar
  • Timing Test of the Circuit Breaker
  • Timing Test of the Isolator Switch
  • Timing Test of the Earth Switch
  • 10 KV Test For Earth Switch
  • Challenges of Testing Instrument Transformers
  • The Purpose of The Characteristic Test in Current Transformer
  • The Importance of The CT Loop Test
  • The Purpose of The Primary Test in Current Transformer
  • The Purpose of The Characteristic Test in Voltage Transformer
  • The Importance of The VT Loop Test
  • Which is better MRCT or CT Analyzer with Current Transformer Tests ?
  • Functional and Interlocking Test
  • The Purpose of The BusBar Stability and Sensitivity Test
  • The Importance of The High Voltage Test
  • Partial Discharge Sensors
  • how to Test Partial Discharge in Site ?

Who this course is for:

  • Anyone interested in electrical engineering
  • Electrical undergraduates
  • Electrical graduates
  • Workers in the electrical utility industry
  • Electricians

Course content

Introduction

  • GIS Basics
  • Testing Challenges
  • Grounding links removed for testing
  • Interview Question

Circuit Breaker Tests

  • CB Contact Resistance
  • BusBar Contact Resistance
  • Contact Resistance Test By MOM 600
  • Timing Test For CB
  • Injection Kit With Circuit Breaker
  • CB Timing Test on Site
  • Timing Test By DualGrounding Methode
  • Interview Question

Dissconnector Switches Tests

  • Timing Test For Earth Switch
  • Timing Test on Site For Earth Switch
  • Bus Diss Timing Test
  • Fast Earth Switch
  • 10 KV Test
  • Interview Question

Current Transformer Tests

  • Instrument Transformer Test Challenge
  • Insulation Resistance Test
  • Connection MRCT With CT
  • PowerDB Software
  • CT Characteristic Test
  • CT Analyzer or MRCT
  • CT Loop Test
  • Single Earth Point
  • Primary Injection Test
  • Primary Injection Test Sheet
  • Primary Injection Test on Site
  • Interview Question

Voltage Transformer Tests

  • IVT and CVT Voltage Transformer
  • CVT IR and Polarity and Turns Ratio Test
  • VT Characteristic Test
  • VT Loop Test
  • Interview Question

Function Test

  • Mechanical Check and Visual Inspection
  • DC Check and Earth Problem
  • CB Closing – Triping and blocking condition
  • 4- Check Operation and Indication
  • Functional and Interlocking Test
  • Interview Question

BusBar Stability Test

  • Stability Test
  • Sensitivity Test
  • Stability Test on Site
  • Interview Question

High Voltage Test

  • Partial Discharge
  • Partial Discharge Sensor
  • High Voltage Test on Site
  • Interview Question

Instructor

Testing Commissioning 115 KV GIS Part 2 By Osama Abdel Aziz

Osama Abdel Aziz
Bachelor of Electrical engineering (power & machines).
Osama Abdel Aziz

Hello,

I’m Osama Abdel Aziz

Electrical Power Systems Engineer

I Have

Bachelor of Degree in Electrical Power and Machines Engineering

i am work naw as protection enginner in EETC company

I share with you my academic and practical experience

I I find a real joy in teaching :).

Choosing an interesting and challenging field such as electrical engineering is a blessing and a gift I’m grateful For

Excellent knowledge and delivering the theory and practical concept with such an ease.

Trainer possesses strong competency in power plant and substation secondary system, scheme like busbar protection, breaker failure protection, substation automation, transformer differential, substation schemes lines/transformer/reactor/busbar, testing & commissioning of relays, scheme testing, testing of GIS/AIS substation equipment, testing of generator protection, on site trainings.

Testing Commissioning 115 KV GIS Part 2 By Osama Abdel Aziz, what is it included (Content proof: Watch here!):

  • 01 Introduction
  • 02 Circuit Breaker Tests
  • 03 Dissconnector Switches Tests
  • 04 Current Transformer Tests
  • 05 Voltage Transformer Tests
  • 06 Function Test
  • 07 BusBar Stability Test
  • 08 High Voltage Test