-57%

Testing Commissioning 115 KV GIS By Osama Abdel Aziz

$15.00

File size: 2.46 GB
Media Type: Online Course
Delivery Time: 1-12 hours.
Content proofWatch here!

Description

Testing Commissioning 115 KV GIS By Osama Abdel Aziz – Instant Download!

Testing Commissioning 115 KV GIS
Reading Scheme OF GIS Drawing , Make Interface with Protection And Control Scheme

What you’ll learn

  • Wire Specification And Ferrouling System OF GIS Bays
  • SF6 GAS Scheme Diagram For All GIS Compartment
  • The Distribution OF DC Power Supply
  • Close Circuit Breaker From SAS Operating System and Emergency
  • The Different Between Service Position OF Circuit Breaker And Maintenance Position
  • Modification OF Maintenance Position In LCC Drawing
  • Synchronization Conditions For Circuit Breaker
  • The Important OF Trip Circuit Supervision For Circuit Breaker
  • Philosophy of Trip With Mechanical and Electrical Protection
  • High Impedance BusBar Protection Theory
  • The Important OF Using Early Make And Late Break Contact For Bus Disconnector
  • High Impedance BusBar Protection Zone (Discrimination Zone And Check Zone)
  • Philosophy of Trip For BusBar Protection
  • Circuit Breaker Fail Protection Theory
  • Philosophy of Trip For Circuit Breaker Fail Protection
  • Philosophy of Interlock To Ensure the Safe Operation OF The Stations
  • Philosophy of Interlock Between HV circuit Breaker And Earth Disconnector in Low Voltage Side
  • SF6 Alarm For All GIS Compartment
  • AC And DC Supervision Alarm

Requirements

  • The basic electrical principles
  • An interest in electrical utilities

Description

Dear fellows,

This is the most comprehensive online training of gas insulated substation . Here you will learn all thing about GIS.

Gas insulated substations are the most common type of substation that you will find on the electrical network, due to their effectiveness and simplicity.

This course will give you an appreciation of how to design,commissioning this type of substation and introduce you to all of the equipment’s that you will find in a typical gas insulated substation.

we will go through the following topics

  • Wire Specification And Ferrouling System OF GIS Bays
  • SF6 GAS Scheme Diagram For All GIS Compartment
  • The Distribution OF DC Power Supply
  • Close Circuit Breaker From SAS Operating System and Emergency
  • The Different Between Service Position OF Circuit Breaker And Maintenance Position
  • Modification OF Maintenance Position In LCC Drawing
  • Synchronization Conditions For Circuit Breaker
  • The Important OF Trip Circuit Supervision For Circuit Breaker
  • Philosophy of Trip With Mechanical and Electrical Protection
  • High Impedance BusBar Protection Theory
  • The Important OF Using Early Make And Late Break Contact For Bus Disconnector
  • High Impedance BusBar Protection Zone (Discrimination Zone And Check Zone)
  • Philosophy of Trip For BusBar Protection
  • Circuit Breaker Fail Protection Theory
  • Philosophy of Trip For Circuit Breaker Fail Protection
  • Philosophy of Interlock To Ensure the Safe Operation OF The Stations
  • Philosophy of Interlock Between HV circuit Breaker And Earth Disconnector in Low Voltage Side
  • AC And DC Supervision Alarm

Who this course is for:

  • Anyone interested in electrical engineering
  • Electrical undergraduates
  • Electrical graduates
  • Workers in the electrical utility industry
  • Electricians

Course content

Introduction

  • Substation Automation System (SAS)
  • Wire Specification
  • SF6 GAS Scheme Diagram
  • DC Power Supply
  • Interview Question

Circuit Breaker

  • CB Close Control
  • Maintenance Position
  • Close CB From Emergency
  • Close CB From SAS
  • CB Service Condition
  • Synchronization Conditions
  • Interview Question

Differential Protection _ Mechanical Protection

  • Trip Circuit Supervision
  • Protection Lock-out Relay Circuit
  • The Different Between 86T1 And 94T1
  • Modification OF Protection Scheme
  • Interview Question

High Impedance BusBar Protection

  • Differential Protection Theory For Busbar
  • Discrimination Zone
  • CT Circuit Zone – 1B,2B Differential Protection
  • Check Zone
  • Interview Question

Circuit Breaker Fail (CBF)

  • The Theory OF CBF
  • CBF Trip
  • Interview Question

Philosophy of Interlock

  • BusBAR Disconnector Interlock
  • D610 Interlock
  • Load Transfer
  • D610 – K614 Motor Control
  • D612 Interlock
  • D614 – K616 – K618 Interlock
  • Interview Question

Alarm

  • Circuit Breaker And Disconnector Alarm
  • AC And DC Supervision
  • SF6 Alarm
  • Interview Question

Instructor

Testing Commissioning 115 KV GIS By Osama Abdel Aziz
Osama Abdel Aziz
Bachelor of Electrical engineering (power & machines).

Hello,

I’m Osama Abdel Aziz

Electrical Power Systems Engineer

I Have

Bachelor of Degree in Electrical Power and Machines Engineering

i am work naw as protection enginner in EETC company

I share with you my academic and practical experience

I I find a real joy in teaching :).

Choosing an interesting and challenging field such as electrical engineering is a blessing and a gift I’m grateful For

Excellent knowledge and delivering the theory and practical concept with such an ease.

Trainer possesses strong competency in power plant and substation secondary system, scheme like busbar protection, breaker failure protection, substation automation, transformer differential, substation schemes lines/transformer/reactor/busbar, testing & commissioning of relays, scheme testing, testing of GIS/AIS substation equipment, testing of generator protection, on site trainings.

Testing Commissioning 115 KV GIS By Osama Abdel Aziz, what is it included (Content proof: Watch here!):

  • 01 Introduction
  • 02 Circuit Breaker
  • 03 Differential Protection _ Mechanical Protection
  • 04 High Impedance BusBar Protection
  • 05 Circuit Breaker Fail (CBF)
  • 06 Philosophy of Interlock
  • 07 Alarm